• Home
  • Interview Questions
  • Online Quiz Tests
  • Blog
  • Contact Us

Global Guideline - Interviewer and Interviewee Guide

Links
  • Home
  • Interview Questions
  • Online Quiz Tests
  • Blog
  • Contact Us
  1. Interviews
  2. Construction Manager
  3. Construction Welder

Construction Welder Question:

Tell me how much area is required for Pre-heat?

Construction Welder Interview Question
Construction Welder Interview Question

Answer:

75 mm minimum from both end of the Joint.


Previous QuestionNext Question
Tell me what is meaning for SAES, SAEP and SAMSS?Do you know what are the defects we can find in visual Inspection?

Interview Categories:

    • Architect
    • Benefits Analyst
    • Construction Labor
    • Construction Safety
    • Construction Welder
    • Demolition Specialist
    • Demolition Worker
    • Demonstrator Promoter
    • Draftsman
    • Estimator
    • Leasing Consultant
    • Production Supervisor
    • Professional Architect
    • Real Estate Analyst
    • Real Estate Broker
    • Real Estate Developer
    • Rigger/Technician

Most Popular Quiz Categories:

Java AWT And SwingHTMLSQLOOAD (Object Oriented Analysis and Design)SAT (Scholastic Aptitude Test) Sentence CorrectionBiology Aptitude TestStatistics Aptitude TestNetworkingChemistry Aptitude TestManagement

Most Popular Interviews

  • Business and Economy
  • Networking
  • Computer Programming
  • Operating System
  • Computer Hardware

Most Popular Quizzes

  • Information Technology
  • Networking
  • Engineering
  • Accounting
  • Java

Keep in touch with us

 

Copyright © 2007 - globalguideline.com

all rights reserved.
  • About Us
  • Contact Us
  • Blog
  • Terms of use
  • Privacy Policy