SQA Engineer Question:

How do an incremental process model and certification work together to produce high quality software? In your own words, describe the intent of certification in the clean room software engineering context?

Software Quality Assurance Engineer Interview Question
Software Quality Assurance Engineer Interview Question

Answer:

Cleanroom development uses an iterative approach, in which the product is developed in increments that gradually
increase the implemented functionality. The quality of each increment is measured against pre-established standards to
verify that the development process is proceeding acceptably. A failure to meet quality standards results in
the cessation of testing for the current increment, and a return to the design phase.


Previous QuestionNext Question
What is the main difference between Stress and load testing? Give us answer with Proper Examples?Are there characteristics of a system that cannot be established during system engineering activities? Describe the characteristics, if any, and explain why a consideration of them must be delayed until later engineering steps?