A Plus Hardware Certification Question:
Download Questions PDF

During boot-up, the memory test:
A. Is a superfluous step that should be ignored
B. Checks and verifies that contiguous memory is installed
C. Is an operational error
D. Displays what memory is installed, but nothing else
E. None of the above

Answer:

Option A
Is a superfluous step that should be ignored

Download A + (Plus) Hardware Interview Questions And Answers PDF

Previous QuestionNext Question
When we are testing a fuse, we should set the Volt-OHM meter to what scale?
A. AC
B. DC
C. AMPS
D. OHMS
E. None of the above
A customer has just installed a new cd-rw. the system was working fine before the installation, but now the cdrom does not work, what should you suggest that the customer do?
A. flash or upgrade the BIOS
B. check the CONFIG.SYS
C. add cdrw in the device manager
D. check the jumper setting on the cd-rw
E. None of the above