Optimize your Quality Assurance interview preparation with our curated set of 113 questions. These questions will test your expertise and readiness for any Quality Assurance interview scenario. Ideal for candidates of all levels, this collection is a must-have for your study plan. Download the free PDF now to get all 113 questions and ensure youre well-prepared for your Quality Assurance interview. This resource is perfect for in-depth preparation and boosting your confidence.
Tweet Share WhatsApp

113 Quality Assurance Questions and Answers:

1 :: Tell me how you will define "Quality"?

Quality can be defined as the condition achieved when an item, service, or process meets or exceeds the user's requirements and expectations.
Download PDFRead All Quality Assurance Questions

2 :: Tell me how do you determine the correct installation of flow orifice?

The orifice data (tag) shall be punched in the up stream of orifice , the data (tag) side shall be in the upstream of flow direction.

3 :: Do you know what is Bug triage?

A bug triage is a process to

☛ Ensure bug report completeness
☛ Assign and analyze the bug
☛ Assigning bug to proper bug owner
☛ Adjust bug severity properly
☛ Set appropriate bug priority

4 :: Tell me when to start QA in a project?

A good time to start the QA is from the beginning of the project startup. This will lead to plan the process which will make sure that product coming out meets the customer quality expectation. QA also plays a major role in the communication between teams. It gives time to step up the testing environment. The testing phase starts after the test plans are written, reviewed and approved.

5 :: Explain what has been your greatest accomplishment?

Through years of working at very different careers, knowing that the quality department is where I belong and the happiest.
Download PDFRead All Quality Assurance Questions

6 :: Why are you the best candidate for the job?

XX has a rep for quality, I want quality things in my life. My past positions has taught me the little things matter in very part of your work XX would want someone like me to watch over what they sell to others to ensure quality is not lost.

7 :: Explain what are QA/QC's ITP's and QCP? Give a brief?

ITP: This is procedure informs about the kinds of quality check (surveillance inspection witness or hold points) means quality of works is being done in proper sequences.

QCP: This is procedure addresses the activities and requirement in details.

8 :: Explain what is final RFI? When it shall be raised up?

When the QA/QC department of contractor is satisfied that the work detailed in the construction RFI is completed, then request shall be submitted for inspection to the client QA/QC department.

9 :: Tell me what are the required documents for a local loop folder?

Following are the required documents for a local loop folder:

☛ Loop package check list
☛ ILD (if not mechanical loop)
☛ Cable megger report (primary prior to pulling) if not mechanical loop
☛ Cable megger report (secondary after pulling) if not mechanical loop
☛ Alarm list ( if not mechanical loop)
☛ P&ID
☛ ISS/ISD (instrument specification sheet/instrument data sheet)
☛ Calibration record (TR)
☛ Pressure test record(TR) if required
☛ MC check record (local loop)(green color)
☛ MC punch list
☛ Visual check punch list/loop check punch list.

10 :: Explain what is the difference between the QA and software testing?

The role of QA (Quality Assurance) is to monitor the quality of the process to produce a quality of a product. While the software testing, is the process of ensuring the final product and check the functionality of final product and to see whether the final product meets the user's requirement.