Site Supervisor Question:
Download Questions PDF

Tell me why is propping required for long structures once the formwork is removed?

Site Supervisor Interview Question
Site Supervisor Interview Question

Answer:

Once the process of concreting is performed the striking of the formworks should be done as soon as possible as delay in this process can lead to the discoloration of the concrete structures. In case of long structures particularly long span structures once the structures have attained enough strength to support themselves it is essential to provide them with propping as creep deflection can take place which can greatly reduce the integrity of the structure. Due to the above mentioned reasons propping should be done after the removal of formwork. Also the props should not be made to stand long as it can lead to overstress for the structures.

Download Site Supervisor Interview Questions And Answers PDF

Previous QuestionNext Question
Tell me in case if concrete box girder bridges how is the number of cells determined?Tell me what would you like to be doing five years from now?