How can PS be linked to COPA? How will the settlement take place in this case (when PS is linked to Controlling through COPA)?
Answer:
Settlement will take place via profitability segmenet .
Level 1 WBS should have settlement rule define to be
settled to PSG and level 2 WBS should be settled to
superior one WBS element .The main one level 1 WBS/ Project
will be settled to PSG , and variance will be posted to
COPA .