Answer:
A defect that is confirmed by the team to be a bug but the effort to correct it at this time exceeds the ROI (Return On Investment). This can often be the case when a re-design is scheduled for that area of the application or if technology barriers exist that make correction of the bug prohibative.
Previous Question | Next Question |
Explain why we call water fall model as waterfall? | What is main difference between Continuous Integration and Iterative Models? |