Material Cost Question:

What is Re-order level?

Tweet Share WhatsApp

Answer:

This level is fixed between maximum and minimum level in such a way that the requirement of materials for the production can be met properly till the fresh supply of material is received. This level of material stock indicates that steps should be taken for procurement of further lots of material.

Download Material Cost PDF Read All 27 Material Cost Questions
Previous QuestionNext Question
What is Minimum level?What is Danger level?