SQA Engineer Question:

What are the Project Control Activities?

Tweet Share WhatsApp

Answer:

The following are the activities of project control:

- Verify the integrity of the database files.
- Check the transcription errors while inputting and referencing the data.
- Verify the data consistency.
- Perform the internal review of documents.
- Perform the completeness check.
- Compare the existing results with previous results.

Download Software Quality Assurance Engineer PDF Read All 48 Software Quality Assurance Engineer Questions
Previous QuestionNext Question
List the benefits of Software Quality Control?Described Software Quality Control Reviews?