Answer:
The following are the activities of project control:
- Verify the integrity of the database files.
- Check the transcription errors while inputting and referencing the data.
- Verify the data consistency.
- Perform the internal review of documents.
- Perform the completeness check.
- Compare the existing results with previous results.
- Verify the integrity of the database files.
- Check the transcription errors while inputting and referencing the data.
- Verify the data consistency.
- Perform the internal review of documents.
- Perform the completeness check.
- Compare the existing results with previous results.
Previous Question | Next Question |
List the benefits of Software Quality Control? | Described Software Quality Control Reviews? |