SS7 Question: Download Signalling System No 7 (SS7) PDF

What are 4 parameters between node A and node B, to bring a PCM link up between them?

Tweet Share WhatsApp

Answer:

The four parameters between node A and node B, to bring a
PCM link up between them are
1.DPC(Destination Point Code) and OWNSP

2.Signaling Link set.

3.Network ID(NAT0 & NAT1)

4.PCM channel on which link is creating

Download Signalling System No 7 (SS7) PDF Read All 21 Signalling System No 7 (SS7) Questions
Previous QuestionNext Question
Explain how many types tcp/ip protocol?Data can be stored permanently in computer through what?