Pre Engineering Question:

Tell me why should curing not be done by ponding and polythene sheets?

Pre-Engineering Interview Question
Pre-Engineering Interview Question

Answer:

The primary purpose of curing is to reduce the heat loss of concrete that is freshly placed to the atmosphere and in order to reduce the temperature gradient across the cross-section of the concrete. Ponding is not preferred for curing as this method of thermal curing is greatly affected by cold winds. In addition to that in ponding large amounts of water is used and has to be disposed off from the construction sites. Polythene sheets are used on the basis that it creates an airtight environment around the concrete surface henceforth reducing the chances of evaporation over fresh concrete surfaces. But the usage of polythene can be a drawback as it can be easily blown away by winds and also the water lost by self-desiccation cannot be replenished.


Previous QuestionNext Question
Tell me briefly the various methods of concrete curing?Tell me briefly the advantages and disadvantages of using plastic and timber fenders?