Dam Construction Inspector Question: Download Dam Construction Inspector PDF
Tell me about a time when you had to think strategically?
Answer:
There was a time when I was told I had to get rid of 20% of my people. I had to determine which persons I needed the most by determining who could do what. I had to put aside personal feelings so that I could keep a working crew to handle he same workload with less people.
Download Dam Construction Inspector PDF Read All 75 Dam Construction Inspector QuestionsPrevious Question | Next Question |
What do you do in your spare time? | Why did you select the University _______? |