Television Production Assistant (TV Production Ass Question: Download Television Production Assistant (TV Production Ass PDF

Tell me about a time when you had to think strategically?

Tweet Share WhatsApp

Answer:

There was a time when I was told I had to get rid of 20% of my people. I had to determine which persons I needed the most by determining who could do what. I had to put aside personal feelings so that I could keep a working crew to handle he same workload with less people.

Download Television Production Assistant (TV Production Ass PDF Read All 73 Television Production Assistant (TV Production Ass Questions
Previous QuestionNext Question
You notice there are too many non productive internal meetings being held, what do you do?What would you do if you won the lottery?