Project Drilling Engineer Question: Download Project Drilling Engineer PDF

Tell me about a time when you had to think strategically?

Tweet Share WhatsApp

Answer:

There was a time when I was told I had to get rid of 20% of my people. I had to determine which persons I needed the most by determining who could do what. I had to put aside personal feelings so that I could keep a working crew to handle he same workload with less people.

Download Project Drilling Engineer PDF Read All 70 Project Drilling Engineer Questions
Previous QuestionNext Question
How did you hear about the position As Project Drilling Engineer?What have you done to improve your skills over the past year As Project Drilling Engineer?