ERP Operations Management Question:
In MRP (Materials Requirements Planning) the Bill of Materials is:
Answer:
► 1. The sum of stock-on-hand and work-in-progress
► 2. A list of required safety stock items
► 3. The required output from a process over time
► 4. The difference between planned receipts and current stocks
► 5. The product structure showing where common parts are used
The product structure showing where common parts are used
► 2. A list of required safety stock items
► 3. The required output from a process over time
► 4. The difference between planned receipts and current stocks
► 5. The product structure showing where common parts are used
The product structure showing where common parts are used