Test Director Question:

How to use TestDirector in real time projects?

Tweet Share WhatsApp

Answer:

Once completed the preparing of the test cases. 1. Export the test cases in to Test Director. ( it will contain total 8 steps). 2. The test cases will be loaded in the Test Plan module. 3. Once the execution is started, we move the test cases from Test Plan tab to the Test Lab module. 4. In Test Lab, we execute the test cases and put as pass or fail or incomplete. We generate the graphs in the test lab for daily report and sent to the onsite (where ever you want to deliver). 5. If you got any defects and raise the defect in the defect module. When raising the defect ,attach the defect with the screen shot.