Explain during reclamation how can the occurrence of mud waves can be rectified?

Tweet Share WhatsApp

Answer:

There are several solution to the rectification of the problem of mud waves:
☛ Complete removal of all the disturbed mud: This method can be considered to be one of the fastest methods. As soon as the disturbed mud is removed some filling material is used to replace the disturbed mud. But economically this method can be expensive as compared to others.
☛ Accelerated consolidation of disturbed mud: In this method surcharging loads are placed on top of the mud waves. Along with this band drains are installed to accelerate the consolidation process. This method is quite slow compared to the other methods.
☛ Partial removal of the disturbed mud: This method is the hybrid of the above two methods where the top layer is removed whereas the lower level is treated with the surcharging process.

Download Site Supervisor PDF Read All 61 Site Supervisor Questions
Previous QuestionNext Question
Tell me what makes a good supervisor?Explain for a washout valve why are two gate valves required in normal practice?