Certified Quality Engineer Question:

Described about bug life cycle?

Tweet Share WhatsApp

Answer:

★ When a tester finds a bug .The bug is assigned with NEW or OPEN status.
★ The bug is assigned to development project manager who will analyze the bug .He will check whether it is a valid defect. If it is not valid bug is rejected, now status is REJECTED.
★ If not, next the defect is checked whether it is in scope. When bug is not part of the current release .Such defects are POSTPONED
★ Now, Tester checks whether similar defect was raised earlier. If yes defect is assigned a status DUPLICATE
★ When bug is assigned to developer. During this stage bug is assigned a status IN-PROGRESS
★ Once code is fixed. Defect is assigned with FIXED status.
★ Next the tester will re-test the code. In case the test case passes the defect is CLOSED
★ If the test case fails again the bug is RE-OPENED and assigned to the developer. That's all to Bug Life Cycle.

Download Quality Engineer PDF Read All 80 Quality Engineer Questions
Previous QuestionNext Question
Can you please explain the difference between Retesting and Regression testing?Do you know how much bug is affecting the functionality of the application?