IBM MainFrame Question:
A job has 90 steps i want to execute only step7 and step15?
Answer:
In the jobcard, Give restart=step7, code cond=(0,le) from
step8 - step14, Give a null stmt(//) after step15. That's
it your requirement is met.
Simplest way:
There is an utility IEBEDIT which is used to execute only
few particular steps from 'n' steps in a jcl.
//JOBCARD
//STEPNAME EXEC PGM=IEBEDIT
//SYSUT1 DD DSN=MYPRGM.DSN,DISP=SHR
//SYSUT2 DD SYSOUT=(*,INTRDR)
//SYSIN DD *
EDIT TYPE=INCLUDE STEPNAME=(STEP7,STEP15)
/*
//
MYPRGM.DSN = The name of the dataset that has the actual
JCL.
step8 - step14, Give a null stmt(//) after step15. That's
it your requirement is met.
Simplest way:
There is an utility IEBEDIT which is used to execute only
few particular steps from 'n' steps in a jcl.
//JOBCARD
//STEPNAME EXEC PGM=IEBEDIT
//SYSUT1 DD DSN=MYPRGM.DSN,DISP=SHR
//SYSUT2 DD SYSOUT=(*,INTRDR)
//SYSIN DD *
EDIT TYPE=INCLUDE STEPNAME=(STEP7,STEP15)
/*
//
MYPRGM.DSN = The name of the dataset that has the actual
JCL.
Previous Question | Next Question |
A job has 150 steps i want to execute only 57th step? | WHY LRECL NEEDS TO BE 4 EXTRA THEN THE COBOL FILE LENGTH & WHAT IT CONTAIN IN THAT LENGTH? |