Quality Center Question:
Download Job Interview Questions and Answers PDF
What is linking Defect to test in Quality Control?
Answer:
Defects can be linked to test in the defect grid. It helps to run the tests based on the status of the defect. Defects can be linked to other entities as well such as requirements. Linking can be direct or indirect. If the defect link is with entity then QC adds a direct link and if the link is with run step then QC adds an indirect link to its run, test instance, test set and test.
Download HP Quality Center Interview Questions And Answers
PDF
Previous Question | Next Question |
Tell me why to use Filters? How you define it? | Tell me how many built in tables does Quality Center have? |